Construction Update 04.25.19

The contractor is continuing to work on the drainage pump station and control structure.  Pipe installation along SW 2nd Avenue will occur during the next few weeks and drainage well structures will be installed.   Roadway restoration on SW 7th Read More …

Construction Update

The contractor continues work on the new pump station construction on SW 7th St. and the new control structure at SW 11the St.  The underground piping around the pump station is being installed and the last group of well drilling Read More …

Construction Update

The Contractor continues to work on the Pump Station construction on SW 7th St. and the Control Structure on SW 11th St.  Drainage Well drilling will begin on SW 9th Street between SW 2nd Ave and Dixie Highway resulting in Read More …