All drainage force main and drainage well construction has been installed and successfully tested. Roadway, sidewalk and driveway restoration has commenced and is continuing throughout the neighborhood. Pump Station and Control Structure work (SW 7th and SW 11th Streets) is continuing and will continue into the new year (for the pump station).